BUSKİ Fluidized Bed Sludge Incineration and Energy Production Plant

Turkey’s first and only plant which generates electric power from  wastewater sludge

Capacity: 400 ton/day

 

Project Start Date: April 2015

 

Project End Date: April 2017

Project Description

 

Process

The plant includes 2 parallelly-operating incineration systems with a capacity of 200 tons/day. Each incineration system includes a sludge refill system, heat recovery boiler and waste gas treatment system. There is one common turbine system for both systems. 2,500 KW of electricity per hour is generated with the plant that became operational in 2017 and includes one steam turbine generator.

Goals

The direct incineration of dewatered sludge obtained from BUSKİ Wastewater Treatment Plants at the Fluidized Bed Sludge Incineration Plant that has a daily capacity of 400 tons/day. Generation of electricity from the waste heat of this plant and treatment of obtained waste gas.

Districts

All BUSKİ Wastewater Treatment Plants located in the Bursa province

Please click here to watch the video

KUZU GRUP

Sorularınızı Bize İletin.

İLETİŞİME GEÇ