ISKI Paşabahçe Wastewater Pretreatment Plant
Built on a 33,000 square meter tract, the Paşabahçe Wastewater Pretreatment Plant has a wastewater treatment capacity of 575,000 m³ /day. Wastewater flows into the facility through three main channels.
Operational Dates: 2008 – 2013
Capacity: 575.000 m³ / day
Project Description
Built on a 33,000 square meter tract, the Paşabahçe Wastewater Pretreatment Plant has a wastewater treatment capacity of 575,000 m³ /day. Wastewater flows into the facility through three main channels. The first collection main delivers wastewater from the southern parts of the plant; the second main delivers wastewater collected in the Beykoz basin in the North; and the third main delivers wastewater generated in Çavuşbaşı and Paşabahçe.