ISKI Terkos Biological Wastewater Treatment Plant

Currently, the plant has an average flow rate of 2,000 m³ /day that can serve a population of 7,000 residents.

Business Start Date: May 2017

 
Operation End Date:
December 2022

 
Capacity:
18.144 m3 / day

Project Description

 

Built to preserve the Terkos Lake basin, which provides drinking water for Istanbul, the Terkos Biological Wastewater Treatment Plant began to serve the town of Terkos (Durusu) in 2000. Currently, the plant has an average flow rate of 2,000 m³ /day that can serve a population of 7,000 residents.

KUZU GRUP

Sorularınızı Bize İletin.

İLETİŞİME GEÇ